WHAT IS THE AVAILABILITY / LEAD TIME FOR A BOX BEAM COFFERED CEILING SYSTEM?

All Box Beam Coffered Ceiling Systems are made-to-order. Paint-grade systems have a 4 – 6 week manufacturing lead time and stain-grade systems have a 6 – 8 week manufacturing lead time from the date of order. 

Geometric and Bespoke designs may add to the lead times depending on their complexity and size.