WHAT IS THE LEAD TIME FOR A BOX BEAM COFFERED CEILING SYSTEM?

All of our Box Beam Coffered Ceiling Systems are custom manufactured to order. As such, typical production lead times are 4 – 6 weeks for paint-grade systems (i.e. HDU or MDF) and 6 – 8 weeks for stain grade systems (i.e. Wood) from the date of order plus transit/delivery time. 

Geometric and Bespoke designs may add to the lead times depending on their complexity and size.